Site Armor ArmorFence
Woven Silt Fence
What happens on the construction site, stays on the construction site with IKE’S SITE ARMOR ArmorFence, a woven polypropylene silt fence that’s designed to keep soil from washing away into nearby bodies of water or roads. Providing erosion control around a project or work site, this professional-grade, temporary barrier keeps soil exactly where it needs to be to allow for its redistribution after a project is finished—helping return ground stabilization to disturbed lands without having to truck in replacement fill dirt.
DESIGNED TO
Keep soil in place on construction site
SIZES AVAILABLE
3′ x 100′ with (11) 42″ stakes on 10′ centers
Product Specifications
Properties |
Standard |
Unit |
Measurement |
Grab Tensile | ASTM D 4632 | Ib | 100 x 100 |
Properties |
Standard |
Unit |
Measurement |
Grab Elongation | ASTM D 4632 | % | 15 |
Properties |
Standard |
Unit |
Measurement |
Trapezoidal Tear | ASTM D 4533 | lb | 55 |
Properties |
Standard |
Unit |
Measurement |
Opening Size (MaxARV) | ASTM D 4751 | mm (US) | 0.60 (30) |
Properties |
Standard |
Unit |
Measurement |
Permittivity | ASTM D 4491 | sec-1 | 0.20 |
Properties |
Standard |
Unit |
Measurement |
CBR Puncture Strength | ASTM D 6241 | lbs | 250 |
Properties |
Standard |
Unit |
Measurement |
UV Stability (@500 hrs) | ASTM D 4355 | % | 70 |
Properties |
Standard |
Unit |
Measurement |
Weight | ASTM D 5261 | oz/yd2 (gm2) | 2.1 (70) |
Properties |
Unit |
Measurement |
|
Roll Width | ft | 3.0 |
Properties |
Unit |
Measurement |
|
Roll Area | yd2 | master roll |
Installation Instructions
- Dig trench on the uphill side of the proposed line of silt fence.
- Unroll silt fence and position support posts upright.
- Drive support posts into ground downhill of the trench at a depth appropriate for site conditions.
- Bury bottom section along the base and up the side of the trench. Backfill with soil and compact.